THE MOST IMPORTANT WORKS IN 2001-2003

NameModernization of AR-2c Datalogger used in hoist in # I eastern - signals registration from safe circuit, additional analog and binary signals registration.
Executed works scope
  • Supply and installation of TSSA Emergency Brake Logger
  • AR-2c Datalogger modernization - additional binary and analog inputs extension
  • Reprogramming, testing and startup of AR-2c in new configuration
Time rangeAugust 2001
Investor/General ContractorPMUE S.A.
Installation special featurescooperation with TSSA system
NameElaboration, realization and installation of Digital Shaft Set WJG-1 for portable hoist used for shaft revision
Executed works scope
  • Analysis of law requirements and development of functional guidelines and technical realization
  • Development of technical project and DTR
  • Device build, installation and testing as in documentation
  • Parametrization and startup
Time rangeJanuary 2002
Investor/General ContractorCentrum Elektryfikacji i Automatyzacji Górnictwa ''EMAG''
Installation special featuresSpecimen specialized to work in heavy environment - on portable hoist for shaft revision. WJG-1 software and hardware adaptation to cooperation with video recorder (video signal pass on)
NameSupervision system elaboration for temperature measurement and control system on current carrying busbar connections that source machines, with specialized visualization software
Executed works scope
  • Functional guidelines development
  • Switchboard (data concentrator) model build
  • Installation and testing in industrial hall
  • Client software for process visualization elaboration
  • MicroLAN and MODBUS RTU networks integration
Time rangeMay 2001 - September 2002
Investor/General ContractorMonitoring Systems & Control, LLC from Florida USA
Installation special featurescomplete supervision and monitoring system based on 1-Wire and MODBUS RTU (mixed topology) industrial network technology that can work on big industrial area, slow variable physical processes supervision and observation, designed for power supply networks predictive supervision

Gallery

TMCS-centr
NameServer elaboration and programing to implement AR-2c Dataloggers access through TCP/IP - archetype application on Staszic Coal Mine
Executed works scope
  • Server software development with ''ar2c_lp'' native protocol frames tunneling in standard TCP/IP frames
  • Logger 2.0 visualization and communication application upgrade to network version Logger 3.0 that uses server program
  • Net version of Logger development for all AR-2c Dataloggers installed in Staszic coal mine
  • Build, testing and validation of network access to AR-2c Dataloggers, in Staszic coal mine, archetype application
Time rangeJuly 2003
Investor/General ContractorZ.E.U.S. MicroSTER in cooperation with KWK Staszic
Installation special featuresPromotional installation as a training ground
NameAR-2c Datalogger modernization at # VI KWK Budryk to adaptation it to receive signals from USS through PROFIBUS DP bus
Executed works scope
  • Build and installing prototype PROFIBUS DP communication card in AR-2c that enables signal receiving form USS build on PLC's
  • 8 analog inputs (POMMAX type) card supply
  • Measurement of main and induction current
  • Measurement of operational and emergency braking system pressure
  • AR-2c application development to enclose in registration signals received through PROFIBUS DP bus
  • New Logger application version elaborate that enables new signals visualization
Time rangeDecember 2003
Investor/General ContractorP.P.U.H Elcam Sp. z o.o.
Installation special featuresFirst AR type logger that supports signal collection form PLC-based devices, through industrial communication protocols

Gallery

ar2c-1 ar2c-2 (92kB)
generated on shrek in 0,001 seconds