THE MOST IMPORTANT WORKS IN 2006

NameModernization of AR-2c Dataloggers installed in hoist #II eastern and western KWK Piast - upgrade to AR-3c version
Executed works scope
  • Supply and installation of two AR-3c processor blocks
  • Analog inputs scaling in order to adjust current measurements to AR-3c resolution and relation of current and pressures measurement indications
  • Reinstallation of encoders, regulation of velocity and position indicators
  • Loggers inclusion to mine's LAN and data transmission to CRD station startup
  • Logger program ver.4 installation on existing stations
  • Two terminals supply and ''Ar3c-Monitor'' visualization startup
Time rangeJanuary 2006
Investor/General ContractorKompania Węglowa S.A. KWK Piast
Installation special features---

Gallery

KWK Piast
NameSupply and installation of AR-3c in hoist #II western in w KGHM Polska Miedź S.A. o/ZG Rudna
Executed works scope
  • AR-3c Datalogger in specified configuration supply
  • PROFIBUS DP card supply for binary signals registration
  • Datalogger parametrization as specified in ''changelog'' documentation
  • Connection of velocity signal from encoder
  • Installation on place, signals connection, testing and startup
  • Network devices supply and transmission between datalogger and mine's LAN startup (using VDSL modems)
Time rangeFebruary 2006
Investor/General ContractorABB Sp. z o.o.
Installation special features---
NameThree AR-3c Dataloggers supply and startup in laboratory conditions (for later installation on Silvinit shaft in potassium salt mine in Solikamsku) - Russia, middle Ural in Solikamsk - Russian Federation, Central Ural
Executed works scope
  • Three AR-3c Dataloggers supply with: processor's block with cassette, bus and power supply system, communication card PROFIBUS DP in new CIF-COM version, acoustic inputs for single stroke signal converters, new generation of single stroke signal converter, local display
  • DTR, user documentation and Logger program translation to English and Russian
  • Logger ver.4 supply in English and Russian localized versions
  • Dataloggers parametrization as specified in documentation.
  • Logger program build
  • Basic startup in laboratory conditions
  • Prototype of AR3c-audio build and functionality check when connected with machine and AR-3c Datalogger
Time rangeMarch 2006 - supply, May 2006 - startup
Investor/General ContractorABB Automation Technologies AB - Sweden
Installation special featuresDataloggers will be equipped with AR3c-Audio sound recording attachment for speech recording between shaft mechanic room and signaler basements and vessel - this option is an implication of Russian Federation law.

Gallery

abb1 abb2
NameDatalogger supply with a set of spare parts to installation in hoist #II spare shaft in apatite mine in Kolski Peninsula - Russian Federation
Executed works scope
  • AR-3c Datalogger supply with a set of spare parts: processor's block with cassette, bus and power supply system, PROFIBUS DP communication card, acoustic inputs to connect single stroke signals converters, new generation of single stroke signals converter, encoder for velocity and position measurement, local display
  • Logger ver.4 supply in English and Russian localized versions
  • Dataloggers parametrization as specified in ''changelog''.
  • Logger program build
  • Basic startup in laboratory conditions
  • GSM communication module supply for remote control and service
Time rangeMay 2006
Investor/General ContractorCarboautomatyka Holding Sp. z o.o. in cooperation with Elcam sp. z o.o., MDJ Electronic sp. z o.o. and ''Proel'' Gliwice
Installation special featuresCommunication module extension that integrates with PLUS GSM cellular phone system for remote supervision, diagnosis and parametrization
NameSupply, installation and startup of AR-3c Datalogger in hoist #Janina III in PKW S.A. ZG Janina
Executed works scope
  • Supply AR-3c with two MODBUS RTU communication cards and local display
  • Register installation in dust proof closet
  • Connection and startup transmission via MODBUS bus
  • Logger program build
Time rangeAugust 2006
Investor/General ContractorCarboautomatyka Holding sp. z o.o. in cooperation with Elcam sp. z o.o
Installation special features---
NameModernization of AR-2c in hoist #IV KWK Jas-Mos
Executed works scope
  • Processor replacement from AR-2c to AR-3c
  • PROFIBUS DP communication module extension
  • Datalogger cassette modernization and power supply circuit replacement
  • Local display extension
  • Logger application program
  • A set of VDSL modems supply, network line commutation and transmission startup form Datalogger to LAN
  • CRD computer upgrade with network adapter
Time rangeAugust 2006
Investor/General ContractorMWM Elektro Sp. z o.o.
Installation special features---
generated on shrek in 0.002 seconds